Retainage explained: why the last 10% takes the longest

What retainage is, how it builds up on a pay application, and how it is released at the end of a job.

Short answer

Retainage is a share of each payment that the owner holds back until the work is complete. It is usually released at the end of the job, which is why the last part of the contract value takes the longest to collect.

In DrawOx, each pay application adds to the retainage already held, using one rate set on the contract. You enter a release on the application when part of the retainage is paid out.

What retainage is

Owners hold retainage as security that the work will be finished and that any defects will be corrected. The amount held back, and the conditions for releasing it, come from the contract, so read yours before you bill.

The rate and the release terms vary by contract and by state. Treat this article as general guidance, not as a legal rule.

How retainage builds up on each application

Retainage accumulates from one application to the next. Each new application starts with the retainage already held and adds the retainage on the new work.

DrawOx carries retainage forward only from applications that have been approved. An application that is still a draft, or is under review, does not change the starting figure for the next one.

The retainage formula

On each pay application, the app works out the retainage held in this way:

Retainage held = retainage carried forward + rate × (work this period + materials stored) − amount released.

  • Carried forward: the retainage held on the last approved application.
  • Rate: the retainage percentage on the application.
  • Work this period and materials stored: the amounts billed on this application.
  • Amount released: the retainage released this period.

What the formula applies to

The rate is applied to the work and stored materials billed on this application, not to the whole contract each time. The earlier retainage arrives through the carried-forward figure.

Total earned less retainage is then the total completed and stored, minus the retainage held. That figure is the base for the payment due on the application. You can check the figure with our free pay application calculator.

Where the rate comes from

The retainage rate is set on the prime contract. When you create a pay application, it takes that rate from the contract.

There is one rate for the application, not a separate rate for each line. Each line shows its own retainage, but it is the completed-and-stored amount on that line times the same rate.

The contract can be edited while it is in draft or out for signature, and it is locked once it is approved. Settle the rate before the contract is approved.

Releasing retainage

To release retainage, enter the amount in the "Retainage released this period ($)" field on the pay application. The field is saved with the application while the application can still be edited.

A release reduces the retainage held. The application summary shows it as "Retainage released this period", next to "Retainage to date".

Common mistakes

  • Applying the rate to the wrong base. Confirm what your contract says retainage is calculated on before you set the rate.
  • Forgetting to carry the balance forward. The starting point for each application is the retainage held on the last approved one.
  • Releasing too early. Release only what the contract allows, and only when its conditions are met.

Plan for the last payment

Retainage is the money that arrives last, so plan cash flow around the balance still held. Check the balance on each application so the final release is not a surprise.