DrawOx Blog
Construction management, explained
Practical guides on running RFIs, submittals, pay applications and field reports on a construction job.
Contractor invoicing software: what to look for
What contractor invoicing software should do, which invoice types it must handle, and how to match a tool to how you bill, from solo trades to GCs.
AIA pay application: what it is and how it works
What an AIA pay application is, how the G702 and G703 work, a worked example with real numbers, and the mistakes that get applications returned.
Free construction invoice template (Excel)
Download a free construction invoice template with itemized lines, markup, tax, retainage and a balance due that calculates, plus what to include.
Construction management software for small business
How a small contractor should choose construction management software: what to look for, which workflows to start with, and how to test a tool on one real job.
How to write an RFI: steps, example and checklist
Write an RFI that gets a fast, clear answer. Follow six steps, see a complete filled-in example with the response, and avoid the mistakes that cause delays.
Procore alternative: how to choose, and where DrawOx fits
Thinking about a Procore alternative? See when Procore fits, what to compare, how to migrate safely, and where DrawOx fits for smaller teams.
How to track change orders without Excel
Move your change order log out of Excel. See what every record needs, how to track pending and approved totals, and how to carry approved changes into billing.
AIA pay application alternatives compared
Compare the ways to prepare a G702/G703-style pay application: official AIA forms, spreadsheets and billing software, and when each one is the right fit.
How to track owner pay applications
Track every owner pay application across billing periods: what to record, how statuses move, how retainage carries forward, and a month-end routine.
How to build a reusable assembly cost database
Build a reusable assembly cost database: structure items, price one assembly with a worked example, keep prices current, and apply it to estimates.
How to track RFIs without Excel
Replace your Excel RFI log with a tracker that shows who holds each RFI, what is overdue and which answer is official. Includes a free RFI log template.
How to manage construction specifications digitally
Move your spec book out of binders and folders. Organize specs, control revisions, find the governing section fast and keep specs and drawings aligned.
How to document delays in daily reports
Write delay entries that hold up later: what to record, sample wording for six common delays, how to back them with photos and records, and a free delay log.
Switching from spreadsheets to construction software
A phased plan for moving from Excel to construction software: signs you have outgrown spreadsheets, what to move first, and how to bring subs along.
How to run a punch list that closes out on time
Start the punch walk at the right time, assign each item with a due date, verify the work, and close out before the final payment waits on it.
How to run inspections with a checklist that holds up
Use a written inspection checklist with Pass, Fail and N/A results, photos on failed items, and a tracked follow-up that closes out.
Keep a photo record that proves what happened on site
Date and organize site photos by album so you can show conditions, progress or damage at a specific point in time, months after the work.
How to calculate percent complete on a pay application
Work out percent complete for each line of a schedule of values from work completed, stored materials and the scheduled value, with a worked example.
Meeting minutes that hold up if there is a dispute
Record who attended, what was decided and who owns each action item, so the minutes stand up when a question comes back months later.
Retainage explained: why the last 10% takes the longest
What retainage is, how it builds up on a pay application, and how it is released at the end of a job.
Lien waivers: the paperwork that protects your payment
Why lien waivers matter before you pay a subcontractor, what to collect, and how DrawOx holds a payment until they are in.
Change orders: the money you never billed
How unapproved changes turn into lost money, and how to track each change order from request to approved total.
Find the right spec section in a 50 MB book in seconds
How to upload a large specification book, ask by trade or section, and check the page citation before you rely on the answer.
How to track RFIs from open to closed on a construction job
Learn how an RFI moves from draft to open, answered and closed in DrawOx, who holds it at each step, and how to find overdue requests.
How to set up a construction RFI log your team will use
Set up an RFI log your team will use, with clear owners, due dates and one place for official answers.
RFI vs. change order: when to use which
An RFI asks a question about the contract documents. A change order changes the contract. Here is how to tell which one you need.
How to track submittals from submission to approval
Track each submittal from submission to approval, so you know what is open, what is overdue, and who holds it.
How to write a daily site report that holds up in a dispute
Write a daily site report with weather, crews and work done, so the record holds up if a delay or claim comes up later.
How to build a G702/G703 pay application from your schedule of values
Build a G702/G703-style pay application from your schedule of values, with the steps to check before it goes to the owner.