How to track submittals from submission to approval

Track each submittal from submission to approval, so you know what is open, what is overdue, and who holds it.

Short answer

A submittal package goes out for review, comes back with a response, and needs a record of each step. To track one in DrawOx, log the package with its due and needed-on-site dates, name the people in each review role, and follow its step and ball-in-court column until it has a response.

A submittal is the product data, shop drawing or sample a contractor sends for review before it buys or installs the item.

The statuses a submittal moves through

While a submittal is still open, it shows one of four step labels.

  • Open: logged but not yet submitted.
  • Submitted: sent into the review chain.
  • In Review: a reviewer or the approver is working on it.
  • Awaiting Resubmission: the response asked for changes, and the submitter has to send a new revision.

What a response means

Once a response is recorded, the submittal is closed and shows the response: Approved, Approved as Noted, Revise and Resubmit, Rejected, or For Record Only.

For Record Only closes the review without counting as an approval. Revise and Resubmit and Rejected open the next revision for the submitter to send.

Who reviews, and what the reviewer sees

The review runs through three roles in order: the subcontractor as submitter, the general contractor as reviewer, and the architect or engineer as approver.

The approver responds from an emailed link. The link is tied to that approver and that one submittal, and it expires. It only works while the submittal is still waiting for a review.

The link shows the submittal number, revision, title, spec section, due date, notes, the attached file, any prior comment, and the response choices. The file opens through a link that is valid for one hour.

The approver's response is recorded against their name, together with their comment.

Overdue submittals and where to see them

A submittal is overdue when it is not closed and its due date has passed. Overdue rows show an Overdue tag, and the submittal list has an Overdue view.

The Project Management Hub has a Submittals card with two counts, Open and Overdue.

A submittal is flagged At risk when its due date falls later than seven days before its needed-on-site date. It is also flagged when that date has passed and the submittal is still open.

What to log for each submittal

Log the submittal number and its revision, so a resubmitted package is easy to match to the one before it. Add the title, the spec section, and the file and any notes the reviewers need.

Name the person in each role: the submitter, the reviewer and the approver. The names are shown in the ball-in-court column, and the approver's name is printed on their emailed link, so check spelling before you send.

Enter the due date and the needed-on-site date. The due date drives the Overdue flag, and the needed-on-site date drives the At risk flag.

A weekly check

  • Look at the Overdue view and chase each overdue reviewer by name.
  • Look at At risk rows and decide whether the needed-on-site date needs a conversation with the team.
  • Check that every closed submittal has a response recorded, including For Record Only.

Why the dates matter

A late review is easier to explain when the record shows the due date that was agreed and the date the package was submitted. The submittal list shows both, so keep them accurate from the day you log the package.

Keep the trail