AI-Powered Construction Document Analysis

Stop Digging ThroughConstruction Documents.

RFPs, specs, contracts, submittals, bid packages — ask questions about any construction document and get cited answers in seconds.

RFPsSpecificationsContractsSubmittalsBid PackagesChange OrdersShop Drawings
Commercial_Tower_RFP_2024.pdf
What are the liquidated damages?
📌 Section 14 — Liquidated damages are set at $2,500 per calendar day of delay beyond the substantial completion date of October 15, 2024.
Is there a DBE requirement?
📌 Section 31 — Yes. A minimum 12% DBE participation is required. Submit a DBE Utilization Plan with your proposal.
What is the bid bond requirement?
📌 Section 8 — A bid bond equal to 5% of the total bid price is required, issued by a surety licensed in the state.
General ContractingCivil EngineeringStructuralMechanicalElectricalPlumbing& All Trades

Features

Everything you need
to bid smarter

No more manually reading 200-page documents. Drawox reads it all so you don't have to.

Instant Answers
Ask any question in plain English. Get answers in seconds, not hours.
📌
Cited Every Time
Every answer references the exact document section. Zero hallucinations.
🏗️
All Document Types
RFPs, specs, contracts, submittals, bid packages, change orders — all supported.
🔒
Secure & Private
Your documents are encrypted. Only you can access your files.
💬
Plain Language
Ask naturally: "What are the liquidated damages?" — get a direct answer.
🗂️
Document Library
All documents saved in your dashboard. Ask questions anytime.

How it works

Up and running in 60 seconds

Three steps. No setup. No training required.

01
Upload your document
RFP, spec, contract, submittal — drag and drop any PDF up to 25MB.
02
Ask plain questions
Type exactly what you need to know, just like texting a colleague.
03
Get cited answers
Direct answers with references to the exact document section.

Testimonials

Estimators love it

Real results from real construction professionals.

"
I used to spend half a day reading RFPs before I could start estimating. Now I get critical info in 10 minutes.
Marcus T.
General Contractor, Texas
"
Found a bonding requirement buried on page 47 that we would have completely missed. Saved us from a costly mistake.
Dana R.
Electrical Estimator, Florida
"
Winning more bids because we're faster and more accurate. Pays for itself on the first document.
James K.
Civil Engineer, California

Ready to win more bids?

Start for free. No credit card required. Cancel anytime.
Join construction estimators saving hours on every project document.