DrawOx features

Construction management, by hub

DrawOx is organized the way a project runs: Project Management, Field Operations, Financial, and Admin and Team. Each feature below is a tool that is built into the app today.

Pre-Construction

Estimating from a cost database and reusable assemblies.

Cost Estimator

Build estimates from a cost database and assemblies.

Build each estimate section by section from items in the cost database. Assemblies are prebuilt groups of items, such as an exterior wall assembly, that you apply to a section instead of entering each item again.

Project Management

Plans, specifications, RFIs, submittals and the forms your project runs on.

Drawings

Drawing sets with revisions, and superseded versions flagged.

Upload sheets as they are issued. The newest revision of each sheet is marked current, and earlier revisions are marked superseded. That keeps the set in one place and makes it clear which sheet to build from.

Submittals

Track submittal packages and approvals.

Log each submittal package and track it from submission through review. A submittal moves from the subcontractor to the general contractor reviewer, then to the architect or engineer approver, in a fixed three-role chain. The Ball in Court column shows who holds the submittal at each step, and the response is recorded as Approved, Approved as Noted, Revise and Resubmit, or Rejected. Open and overdue submittals are counted on the Project Management Hub.

RFIs

Raise and resolve requests for information.

Raise requests for information in one place and track each one through to resolution. Each RFI carries a status and a due date, so the team can see what is open and what is late. Overdue RFIs are counted on the Project Management Hub.

Forms

Build fillable forms per project and export them as PDF.

Create a form template from the field types you need, then fill it in for each project. Templates belong to the project, so each job can use its own forms. A completed form exports as a PDF that you can print or send on.

Spec Chat (beta)

Ask questions about your specs and get answers with file and page citations.

Upload CSI specification PDFs of up to 50MB and ask questions in plain language. Each answer names the source file and page number, so you can open the page and check it against the document. Use it to look up requirements and division details without paging through a spec book. It is in beta, so review each answer against the document before you rely on it.

Meeting Minutes

Agendas, minutes and action items.

Prepare meeting agendas with attendees and agenda items, then record the minutes as the meeting runs. Action items carry an assignee and a due date, and open action items carry over to later meetings. Minutes can be published once they are final, and sending the agenda is logged.

Correspondence

Letters, transmittals and responses.

Log letters, transmittals and other project correspondence in one place. Each correspondence type can require a response, and transmittal types are marked as such. The ball-in-court column shows who owes the next response.

Documents

Project files in folders, with versions and check-out.

Store project files in folders, with a new version each time a file is uploaded. A file can be checked out by one person at a time, and each download is logged. Files marked as tracked keep their full version history.

Field Operations

Daily reports, punch lists, crews and the field records that come out of the job site.

Daily Site Reports

Log weather, crews and work completed each day.

Record each day’s weather, crews and completed work in one report. AI helps write the report up from the notes you enter. The Project Management Hub counts reports this week and safety incidents in the last 30 days, so the daily record is easy to review. Reports stay on the project, so the daily log is complete for the job.

Punch List

Capture and close out punch items.

Log each deficiency as a punch item and close it out when it is fixed. Open and overdue items are counted on the Project Management Hub, so the team sees what is still outstanding before closeout. Closing items as they are completed keeps the list current for the owner walk.

Crews

Crew rosters, daily assignments and over-allocation checks.

Build crew rosters and record each crew’s daily assignments. DrawOx flags a crew that is assigned to two or more different activities on the same working day as over-allocated. Keeping the roster current shows who is on which crew as people move between jobs.

Equipment

Register equipment, log daily hours and track utilization.

Register each piece of equipment and log its hours each day. Weekly utilization is logged hours divided by available hours, using 8 hours per working day, so you can see how hard each machine is worked. The figure is DrawOx’s own calculation, not a manufacturer’s rating. It helps you decide where to move equipment or spot a machine that sits idle.

Inspections

Checklists, observations and inspection templates.

Build inspection templates from sections and checklist items, each answered Pass, Fail or N/A. An item can require a photo when it fails, and a failed item can be raised as an observation with the inspection linked. Inspections move from scheduled to closed, and open and overdue inspections are counted on the hub.

Photo Logs

Site photos organized into albums.

Site photos are kept together in albums for each project, so the visual record of the work stays with the job. Albums keep photos from one project separate from the next.

Financial

Budgets, change orders, subcontracts, pay applications and the billing sheets.

Budget Tracker

Cost codes, budget changes and committed costs.

Set the budget by cost code and track it through the project. Budget changes are recorded as they happen, and committed cost is shown against each code. The Financials Hub shows the revised budget and whether the project is projected over or under.

Change Orders

Price, approve and log change orders.

Log owner and subcontractor change orders with their amounts, and keep the two separate. The Financials Hub shows pending and approved totals, so you can see what is still waiting on approval. Approved change orders appear on the pay application billing summary, so the billing reflects the contract changes.

Subcontracts & POs

Track subcontracts, purchase orders and budget commitments.

Record subcontracts and purchase orders against cost codes, so each commitment is tied to the budget line it pays for. The Financials Hub shows committed cost and what is still pending. Those commitments are the committed-cost figure the budget and the billing are measured against.

Pay Applications

Owner pay applications, subcontractor invoices, billing periods and the prime contract.

Set up billing periods and the prime contract for the project, then prepare owner pay applications for each period. Subcontractor invoices sit in the same area, so both sides of the billing are in one place. Each application uses the prime contract schedule of values and the approved change orders, and a G702/G703-style billing summary is produced from it.

Invoices

Create client invoices and share them by link.

Create invoices for clients and share an invoice link. The client opens the link in a browser and sees the invoice without logging in. You can start an invoice from an estimate and bill the full estimate, a percentage of it, or selected divisions.

AI Lien Waivers

Draft lien waivers for progress and final payments.

Draft conditional and unconditional waivers for progress and final payments, using the details you enter. Each waiver type carries its own legal notice. Review every draft before you use it, because the waiver text sets the lien rights it releases.

Materials

Order-to-install tracking by cost code.

Track each material from order to install, grouped by cost code so its cost stays tied to the budget line it belongs to. The grouping makes it easy to see the material cost for each code as the job moves along.

T&M Tickets

Record extra and out-of-scope work as labor, material and equipment.

Record time-and-material tickets for extra and out-of-scope work, with labor, material and equipment lines. Each ticket’s total is calculated from its lines, so the amount matches the work recorded. Tickets keep the extra work documented separately from the contract scope.

G702/G703-Style Billing

Progress billing summaries laid out like the AIA G702 and G703 forms, built from your project data.

Generate a PDF billing summary laid out like the AIA G702 Application for Payment and G703 Continuation Sheet. It uses your prime contract schedule of values, approved change orders and the retainage percentage you set. It is not the official AIA form, so check it against your own pay application before you send it to the owner.

Admin and Team

What each role can do, and what the team costs.

Role-based permissions

Owner, admin, editor, commenter and viewer roles.

Each person on a project has one role: owner, admin, editor, commenter or viewer. The Team page lists what each role can do. Only the project owner can grant or change the admin role, so admin access stays under the owner’s control.

Seat billing

The Pro plan with a per-seat add-on for team members.

The Pro plan is $149 a month for the company. Each additional team seat is $49 a month, and the total is capped at 25 seats, including the owner. The Team page shows how many seats are used against that limit.

See the pricing

The Pro plan is $149 a month, plus $49 per additional team seat, up to 25 seats.