How to write a daily site report that holds up in a dispute

Write a daily site report with weather, crews and work done, so the record holds up if a delay or claim comes up later.

Short answer

A daily site report records what happened on site on one day, in plain facts, written at the time. Record the date, the weather, the crews on site, the work completed, any delays and any safety incidents, and name any photos taken that day.

A report written that day is easier to defend than one rebuilt weeks later from memory.

What to record

  • Date and weather: the date, which is required, and the weather, chosen from sunny, cloudy, rainy or windy, with the temperature in degrees Fahrenheit.
  • Crew count and subcontractors: the number of crew on site, and the subcontractors on site by name.
  • Work completed today: what was done that day, in plain terms. This field is required.
  • Materials delivered and equipment used: what arrived on site, and which equipment was in use.
  • Safety incidents: Yes or No. If you answer Yes, incident notes are required.
  • Delays or issues: anything that stopped or slowed work, and what caused it.

Fill in the form in order

Start with the date and weather, since those are fixed facts. Then fill in the crews and subcontractors, the work completed and the delays. Finish with the safety answer, because a Yes asks for incident notes straight away.

The form does not take photos. Where a photo matters, name the photo and its time in the work completed or delays field, so the reference is saved with the report.

Write numbers where you can

A line such as "electrical crew of four waited two hours for access to the level 2 corridor" is more useful than "delay in the morning". The first one can be checked against crew hours later.

Name the trade and the area. Say what was waiting, who was responsible if you know it, and how long it lasted.

Where the report lives in DrawOx

Open the Daily Site Report from the dashboard. The screen saves a new report and lists saved reports, newest first by date, twenty to a page.

The same screen is linked from the Field Operations area, so the whole team uses one place for daily reports.

Saving needs only the date and the work completed. Every other field can be left blank, but a blank field is a gap a reader will notice later, so fill in the ones that apply on every working day.

Keep the record

The screen has no edit or delete option for a saved report. If something on a report is wrong, add a new report for that day that says what changed, rather than trying to change the old one.

Reports are saved to the project database, so they are still there after you close the screen.

Before you save, check

  • Did you record the day even if nothing unusual happened?
  • Did you write what the crews did, not what you expect they did?
  • Did you note each delay with its cause and the crew hours lost, if you know them?
  • Did you name any photos you took of an affected area, with the time they were taken?

Why it matters later

If a delay or claim comes up weeks later, the daily reports are usually the first record people look at, and they are read alongside the schedule, the RFI log and the crew sign-in sheets. Complete reports for every working day, including quiet ones, stop the gaps from looking like missing work.

When a delay is the issue, read how to document delays in daily reports.

Start a 24-hour free trial at drawox.online. No card needed.