AIA pay application alternatives compared
Compare the ways to prepare a G702/G703-style pay application: official AIA forms, spreadsheets and billing software, and when each one is the right fit.
TL;DR
You have four ways to prepare a pay application: the official AIA forms, a spreadsheet that copies their layout, billing software that produces a G702/G703-style summary, or a form your owner or GC requires. The right choice depends on what your contract demands.
If your contract names the official AIA form, use it. If it asks for an application in that format, a G702/G703-style summary from software can save hours each month. DrawOx produces the second kind. It is not the official AIA form, and this guide says where that matters.
New to AIA billing? Read AIA pay application: what it is and how it works first.
What the G702 and G703 are
The G702 is the application and certificate for payment. It is the summary page. It shows the original contract sum, approved change orders, the work completed and stored to date, retainage, the amount earned less retainage, and the payment due this period.
The G703 is the continuation sheet. It lists every line of the schedule of values with the scheduled value, work from earlier applications, work this period, stored materials, total completed and stored, percent complete, balance to finish and retainage.
The two forms tie together. The totals on the G703 must match the figures on the G702. Most billing errors come from totals that no longer agree.
Why people look for an alternative
- Retyping the same schedule of values every month.
- Math errors when a spreadsheet formula breaks.
- No link between approved change orders and the next application.
- No record of who approved or certified an application.
- Retainage that does not carry forward correctly.
Four ways to prepare a pay application
| Option | Best for | Watch out for |
|---|---|---|
| Official AIA forms | Contracts that name the AIA form | Retyping each period; manual math |
| Spreadsheet copying the layout | One or two small jobs | Broken formulas; no approval history |
| Billing software with a G702/G703-style summary | Several jobs; frequent change orders | Confirm your owner accepts a non-official form |
| Form or portal required by the owner or GC | Contracts that mandate their own process | You still need your own internal record |
What any pay application tool must get right
Before you pick a tool, check that it handles these basics. The list is the same whether you pay for software or build it yourself.
- A schedule of values where line items add up to the contract sum.
- Work completed this period and stored materials on each line.
- Retainage that carries forward from the last approved application.
- Approved change orders added as their own lines.
- Totals on the continuation sheet that tie to the summary page.
- A record of who approved and certified the application.
- A place for lien waivers and backup documents.
When you still need the official form
Some contracts require the official AIA documents. So do some lenders and public owners. If your contract says so, use the official form and treat any software summary as your working copy.
Ask the owner or GC before your first application if the contract is not clear. A short email costs less than a rejected application. Do not assume a lookalike form is acceptable, and do not assume it is not.
How DrawOx prepares a G702/G703-style application
You set up the schedule of values on the prime contract, with one line per item. The retainage rate lives on the contract, and each new application takes the rate from it.
For each line, you enter the work done this period and any stored materials. If part of the retainage is being released, you enter that too. DrawOx calculates completed and stored to date, balance to finish, retainage, earned less retainage and the payment due.
The application goes to review, where the reviewer approves it or returns it with a comment. Only an approved application can be certified. Only an owner or admin can certify one or lock a billing period.
The PDF has a summary page with the G702 figures and a continuation sheet with one row for each line and columns A to J. It follows the layout of the standard forms, but it is not the official AIA form. Check it against your own application before you send it to the owner.
Approved owner change orders are added to new applications as lines, so the contract changes reach your billing. The build a G702/G703 pay application guide covers each step in detail.
Lien waivers belong in the package
A pay application rarely travels alone. Owners often want a lien waiver with each payment. DrawOx drafts conditional and unconditional waivers for progress and final payments from the details you enter.
The drafts use AI, so read every one before you use it. The waiver text decides which lien rights you release, and the rules differ by state. See lien waivers before each pay application for how to collect them.
Check your numbers before you submit
Whichever route you take, test the math on one line by hand. Add the earlier work, this period and stored materials, divide by the scheduled value, and compare the percent complete to the application.
Our free pay application calculator does this for a full application. If you want the formula first, read how to calculate percent complete and retainage explained.
A short decision guide
- Does the contract name the official AIA form? Use it.
- Do you bill one small job? A careful spreadsheet may be enough.
- Do you bill several jobs with frequent changes? Software that links change orders and retainage saves the most time.
- Does the owner require a portal? Use it, and keep your own record alongside.
What owners check first
Owners and architects review many applications. They usually look for the same few things first, so check them before you send yours.
- The contract sum and approved change orders match their records.
- Percent complete looks reasonable against what they saw on site.
- Stored materials have support.
- The retainage rate matches the contract.
- Totals on the continuation sheet equal the summary page.
- The right waiver or backup is attached.
Common G702 and G703 errors
- Using the original contract sum after change orders are approved.
- Counting stored materials twice.
- Carrying retainage from an application that was never approved.
- Typing over a formula in a spreadsheet and not noticing.
- Leaving off the period dates or the application number.
- Submitting a continuation sheet that no longer ties to the summary.
Questions to ask about any billing tool
Use these when you compare software, ours included.
- Does it carry retainage forward from approved applications only?
- Does it add approved change orders to the next application?
- Is the output the official form or a lookalike, and will my owner accept it?
- Can I see who approved and certified each application?
- Can I lock a billing period after payments are in?
- What happens to my data if I leave?
Switch without surprises
Test before you commit. Take one finished application from a past job, rebuild it in the new tool, and compare every total with the application you actually sent.
If they match, you can trust the setup. If they do not, find out why before you use it on a live job. Start with one job, keep the old method alongside for a period, and move the rest when the numbers agree.
Frequently asked questions
Will an owner accept a G702/G703-style application instead of the official form?
It depends on your contract. Many owners accept an application laid out like the standard forms, but some require the official documents. Check the contract, and ask before your first submission if it is unclear.
Is the DrawOx pay application the official AIA form?
No. DrawOx produces a billing summary laid out like the G702 and G703, built from your contract, change orders and retainage rate. It is not the official AIA form. Review it against your own application before you send it.
What should be on a G703 continuation sheet?
One row for each line of the schedule of values, with the scheduled value, work from earlier applications, work this period, stored materials, total completed and stored, percent complete, balance to finish and retainage. The totals must match the summary page.
Do I need a lien waiver with every pay application?
Many contracts and owners ask for one with each payment, and the rules vary by state. Check your contract and your state rules, and ask a construction attorney if the amount is large or the terms are unclear.
Can a spreadsheet handle retainage correctly?
It can, if you build it carefully. The retainage held on each application is the retainage carried forward, plus the rate times this period's work and stored materials, minus any amount released. The risk is a formula that breaks when someone edits a row.
Start a 24-hour free trial at drawox.online. No card needed.